08
Jan
15

BIG E getting built

Lots of time in the edit bay today on the movie and our weekly show which is 40 minutes this time with lots of cool stuff. It will be uploaded by the morning.
I also got lots done on the big TOS E. Wet primer on the top of the saucer, bridge hull has the windows and light positions cut out. All windows and lights cut out and filed on the lower saucer section. Next up to do the few lighting openings on the upper saucer section and open up all the windows on the engineering section.
To reiterate what this all is this a the large TOS Enterprise made from my original molds for the Museum of Science Fiction in Washington DC.
If you want to get your name on the plague as a contributor you can donate to this non profit build at: http://www.steveneillsgarage.com/donations66-tos-museum-of-…

I want to thanks everyone for the donations to date your are greatly appreciated!

10818276_568580196612287_459918014754948741_o 10900034_568580166612290_3622721068429822753_o 10930126_568580183278955_6889798232324830300_o 10931651_568580149945625_5795512232786718624_o


1 Response to “BIG E getting built”


  1. January 8, 2015 at 6:56 pm

    Looking great so far, Steve. 😀


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s


January 2015
M T W T F S S
« Dec   Feb »
 1234
567891011
12131415161718
19202122232425
262728293031  

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Join 295 other followers


%d bloggers like this: